当前位置:网站首页>100 GIS practical application cases (79) - key points of making multi plan integrated base map
100 GIS practical application cases (79) - key points of making multi plan integrated base map
2022-06-23 07:09:00 【Gatulo book】
The previous article has completed “ Multiple compliance ” Basic data warehousing , On this basis, urban and rural planning should be carried out separately 、 Integration of land use planning and ecological and environmental protection planning , formation Base map of urban and rural planning integration 、 Integrated base map of land use planning 、 Integrated base map of ecological and environmental protection planning , The construction space shall be clearly defined 、 The scope of agricultural space and ecological space , As the basis for the comparison of land use differences in the next step .
One 、 Preparation of integrated base map of urban and rural planning
1.1 Integration of urban planning and land
As shown in the figure , According to the classification standard of urban and rural land , Urban and rural master planning and urban master planning divide construction land and non construction land into several sub categories .

▲ Schematic diagram of land types in the overall urban and rural planning

▲ Schematic diagram of land types in the overall urban planning
According to the requirements of the multi compliance technical guidance , It is necessary to classify and integrate the construction land and non construction land , So as to facilitate the next comparison operation
(1) Reclassification of land types in urban and rural master planning
Open the attribute table of urban and rural master planning map , Add name is CXZG_JSYD( General urban and rural planning _ Construction land ) Property field of , Select various types of construction land and non construction land according to their attributes , Then the field calculator is used to calculate the assignment , The unified assignment of construction land is 1, Non construction land is assigned as -1. According to this, the integrated base map of urban and rural overall planning and construction land is obtained .
边栏推荐
- TP6+Redis+think-queue+Supervisor实现进程常驻消息队列/job任务
- Unet代码实现
- Centos7 MySQL records
- MySQL mvcc multi version concurrency control
- XML schema record
- /Bin/sh no such file or directory problem
- 【项目实训10】箭头的绘制
- MySQL重做日志 redo log
- QT designer cannot modify the window size, and cannot change the size by dragging the window with the mouse
- Endnote20 tutorial sharing (unfinished
猜你喜欢

Chrome remove duplicate bookmarks

Project_ Filter to solve Chinese garbled code

GIS实战应用案例100篇(七十九)-多规整合底图的制作要点

【STL】顺序容器之deque用法总结

Badly placed()'s problem

GINet

MySQL Redo log Redo log

为什么TCP协议是三次握手而不是两次?

Interpreting the spirit of unity and cooperation in maker Education
![[project training] change of linear arrow](/img/a4/7554522c13684d7590d247f28a6965.png)
[project training] change of linear arrow
随机推荐
[STL] summary of map usage of associated containers
Lombok的使用
TP6 安装拓展
[daily training] 513 Find the value in the lower left corner of the tree
QT designer cannot modify the window size, and cannot change the size by dragging the window with the mouse
数据库原理实验测试题,关于图书分类表
322. change exchange
301. delete invalid brackets
What are the pension financial products in 2022? Low risk
XML schema record
Mongodb record
【项目实训10】箭头的绘制
Page embedded iframe click browser back problem
315. calculate the number of elements on the right that are smaller than the current element
QT设计师无法修改窗口大小,无法通过鼠标拖动窗口改变大小的解决方案
The List
redux Actions may not have an undefined “type“ property. Have you misspelled a constant?
313. super ugly number
【STL】关联容器之unordered_map用法总结
对二进制的某一位操作