当前位置:网站首页>2022 construction worker - Equipment direction - post skill (construction worker) test question simulation test platform operation
2022 construction worker - Equipment direction - post skill (construction worker) test question simulation test platform operation
2022-06-23 12:02:00 【zbf123123】
Source of question bank : Safety production simulation test, a little public official account.
2022 Year construction worker - Device direction - Job skills ( Construction worker ) The question is construction worker - Device direction - Job skills ( Construction worker ) The high-frequency examination questions in the question bank of work license cover !2022 Construction worker - Device direction - Job skills ( Construction worker ) The test questions simulation test platform is operated according to the construction personnel - Device direction - Job skills ( Construction worker ) New exam question bank . Construction worker - Device direction - Job skills ( Construction worker ) The test paper passes the one-point learning progress analysis of safety production simulation examination .
1、【 Multiple choice 】ZC-8 Precautions for the use of grounding resistance measuring instrument include ( ).( ABCDE )
A、 Grounding electrode 、 Potential probe 、 The current probe is in a straight line , The potential probe is centered , The three are equidistant , Are all 20m
B、 Grounding electrode 、 Potential probe 、 The current probe leads out insulated wires of the same cross section and connects them to the instrument , One by one correspondence is required, and wrong connection is not allowed
C、ZC-8 The instrument shall be placed in a horizontal position , Check zero adjustment
D、 First set the magnification scale to the maximum multiple , Turn the handle slowly , Place the zero indicator in the middle position , Increase the rotation speed to 120y/min
E、 Multiply the reading of the dial by the scale to obtain the grounding resistance of the grounding device
2、【 Multiple choice 】 The main construction management plan includes ( ).( BC )
A、 Green construction management plan
B、 Quality management plan
C、 Safety management plan
D、 Fire and security management plan
E、 Safety management plan
3、【 Multiple choice 】 The relativity of product quality is shown in ( ).( BC )
A、 The product itself has many properties
B、 Requirements and standards for relevant products 、 Regulations vary from time to time , Over time , Conditions change
C、 The degree to which expectations are met varies according to the degree of user needs , Differ from man to man
D、 Human selectivity
E、 Formulate quality policy and quality objectives
4、【 Multiple choice 】 The special points of resource management of installation engineering are mainly reflected in ( ).( BC )
A、 Resource Management
B、 In terms of human resources
C、 Material management
D、 In terms of scheme design
E、 Construction progress
5、【 Multiple choice 】 The basic requirements for the management of special operators are :( ).( ABC )
A、 Must pass the examination or examination 、 Work with certificate
B、 The certificate of conformity shall be reviewed within the specified time limit
C、 Leaving the special operation for a certain period of time , Must pass the exam again , They can only take up their posts
D、 Must be certified by physical health
E、 Must pass the examination and take the post
6、【 Multiple choice 】 Common construction organization methods include ( ).( ABD )
A、 Construction in sequence
B、 Parallel construction
C、 Sequential construction
D、 Flow construction
E、 Directional construction
7、【 Multiple choice 】 Basis for cost control activities ( ).( ABCE )
A、 The contract for the project
B、 Progress statistics report
C、 Construction cost plan
D、 Specification changes
E、 Engineering changes
8、【 Multiple choice 】 The safety devices of the construction elevator include ( ).( ABD )
A、 Fall protector
B、 Electrical safety switch
C、 Electric door lock
D、 Mechanical lock and mechanical interlocking device of cage door
E、 Interlock device
9、【 Multiple choice 】 Classification of construction schedule , According to the category of mechanical and electrical engineering, there are ( ).( ABC )
A、 Water supply and drainage project schedule
B、 Schedule of building electrical works
C、 Ventilation and air conditioning project schedule
D、 Implementation work plan
E、 Building electrical engineering
10、【 Multiple choice 】 Case study 13-4:( AB )
A、 The electromechanical installation project of a tourist resort villa group in a city along the southeast coast of China undertaken by Si , Is in the closing stage , The water supply and drainage works are mainly the piping of indoor sanitary ware, the washing and disinfection of water supply pipes of each villa and the ball passing test of drainage pipes , The outdoor water spraying pool shall be made with landscaping 、 Laying of water supply pipes for waterscape, etc . It was the rainy season in the South ,A The project Department of the company has arranged the monthly operation plan , Due to better planning ,3 Months of finishing work, although there are twists and turns , But it can be completed on schedule . Case study 13-4 Characteristics of water supply and drainage installation in the final stage of the project ____.
B、 The project is scattered
C、 There are two types of indoor and outdoor working environment
D、 Outdoor work is complicated
E、 The progress of the project will affect the outdoor environment
F、 Explain the supply of resources
11、【 Multiple choice 】 Contents of on-site quality inspection ( ).( ABCD )
A、 Process handover inspection
B、 Check before commencement
C、 Inspection of concealed works
D、 Inspection after shutdown and before resumption of work
E、 There are records in the joint review of drawings
12、【 Single topic selection 】 The insulation resistance of electrical equipment of cargo construction elevator shall not be less than ()MΩ.( D )
A、0.2
B、0.3
C、0.4
D、0.5
13、【 Single topic selection 】 The basket safety lock must be used within the valid period , The valid bid period shall not be longer than one year , The safety lock shall be () test .( C )
A、 Construction unit
B、 Construction unit
C、 Testing agency
D、 construction control unit
14、【 Single topic selection 】 During the demolition and renovation of buildings , The construction area exposed to asbestos shall be provided with (), No irrelevant personnel are allowed to enter .( C )
A、 Flags
B、 Enclosure
C、 Warning signs
D、 Dustproof cloth
15、【 Multiple choice 】 The types of electric hoists are in the form of drums ( ).( AB )
A、 Single cylinder
B、 Double barrel
C、 Reversible reduction box type
D、 Friction clutch type
E、 Multi barrel
16、【 Single topic selection 】 basis 《 Regulations on road freight transportation and station management 》, The operator of the freight station shall formulate regulations on public emergencies ().( B )
A、 Disposal plan
B、 Emergency plan
C、 Disposal measures
D、 Emergency manual
17、【 Multiple choice 】 Network diagram by ( ) The basic elements comprise .( ABC )
A、 Work
B、 node
C、 line
D、 Stagnation point
E、 A straight line
18、【 Single topic selection 】 After sodium ion exchange treatment , The salt content in soft water ().( B )
A、 unchanged
B、 Slightly increased
C、 Slightly lower
D、 not always
19、【 Single topic selection 】 according to 《 Measures for filing and registration of construction hoisting machinery 》 Regulations , The use registration authority shall start from the date of receiving the materials submitted by the user () Within 5 working days , For the construction hoisting machinery that meets the registration conditions and has complete data, the use registration certificate of construction hoisting machinery shall be issued .( C )
A、3
B、5
C、7
D、10
20、【 Single topic selection 】 It does not belong to the characteristics of construction project quality management ( ).( A )
A、 Implement scientific 、 justice 、 Legal professional norms
B、 There are many factors affecting the quality
C、 The quality inspection cannot be disassembled 、 Disassemble
D、 Easy to produce first 、 Second, wrong judgment
21、【 Single topic selection 】 After winning the bid 、 Before commencement, the key of the project department is ( ).( A )
A、 Realization of project quality objectives
B、 Prepare and implement the construction organization design
C、 Make progress 、 quality 、 All indicators of cost and safety can be achieved
D、 Determine quality objectives
22、【 Single topic selection 】 Protect the finished products of FRP air duct , Belong to ( ).( B )
A、 Quality control in advance
B、 In process quality control
C、 Post event quality control
D、 Management and control in advance
23、【 Single topic selection 】 Canteen at the construction site 、 The doorway of the food storage room shall be set according to the regulations “ Mouse Guard ”, Height not less than ().( B )
A、0.4m
B、0.6m
C、0.8m
D、1.0m
24、【 Single topic selection 】 When the installation height of the material elevator is greater than or equal to () when , Do not use wind ropes ( A )
A、30m
B、35m
C、40m
D、45m
25、【 Single topic selection 】 The following figure is the schematic diagram of the actuator of the material lifting mechanism , This brake type is ().
( A )
A、 Electromagnetic block
B、 gradual
C、 uniform
D、 Imbibition
26、【 Single topic selection 】 according to 《 Interim Measures for the administration of highway production risk 》, The level of safety production risk in the highway industry is () level .( C )
A、2
B、3
C、4
D、5
27、【 Single topic selection 】 The demolition of houses shall be undertaken by construction units with corresponding qualifications , from () Be responsible for safety .( A )
A、 Person in charge of the construction unit
B、 Full time safety production management personnel
C、 project manager
D、 Person in charge of the construction unit
28、【 Single topic selection 】 In the type of hazard source , Belonging to the first kind ( ).( A )
A、 Electric energy damage
B、 People's unsafe behavior that deviates from the requirements of the standard
C、 Environmental problems promote human mistakes
D、 The failure of the object occurs
29、【 Single topic selection 】 When the thickness of standard section riser is reduced to the factory thickness () It shall be scrapped or degraded for use .( A )
A、25%
B、20%
C、15%
D、10%
30、【 Single topic selection 】 The boiler structure is mainly composed of ()、 Water wall 、 Header 、 Convection tube bundle 、 Pyrotechnic pipes and other pressure parts and other components .( B )
A、 Steel shell
B、 Drum
C、 Water pipe
D、 Water fire pipe
31、【 Single topic selection 】 When the load is lifted , The minimum distance between the hook head and the end of the arm shall not be less than () rice .( B )
A、0.5
B、1
C、1.5
D、2
32、【 Single topic selection 】 Large size air duct means that the diameter of circular air duct is greater than ( )mm Of .( A )
A、2500
B、2400
C、2000
D、1500
33、【 Single topic selection 】 The safety inspection shall pay attention to the organic combination of mutual inspection and self inspection , Insist on the combination of inspection and rectification , Pay attention to the collection of safety production archives ,( ) It's the foundation .( C )
A、 Keep on working hard
B、 Implement responsibilities
C、 Strengthen management
D、 people oriented
34、【 Single topic selection 】 Method for comparison of construction schemes , The economic comparison is :( ).( A )
A、 Compare the safety and reliability of different schemes
B、 Compare the economic planning of different schemes
C、 Compare the value of different schemes
D、 Compare the contribution of different schemes to the growth rate of construction output value
35、【 Single topic selection 】 As shown in the figure, it is the support of the post cast strip in the basement , The following description is correct ?()
( C )
A、 There is no crack in the concrete at the post cast strip , May not be disposed of , However, the formwork shall be well supported before pouring the concrete at the post cast strip
B、 The formwork support of the concrete poured first at the post cast strip can be removed first , However, the formwork shall be well supported before pouring the concrete at the post cast strip
C、 The support system at the post cast strip has potential safety hazards , Various rods supported by the formwork at the post cast strip must be supplemented as required
D、 Because there is concrete poured first , The requirements for the formwork support system at the post cast strip of the basement can be reduced
36、【 Single topic selection 】 Indirect costs are ( ).( C )
A、 Labor cost
B、 Material cost
C、 traffic expense
D、 Construction machinery use fee
37、【 Single topic selection 】 When the crawler crane is lifting at full load , The heavy objects should be lifted off the ground first ( )mm about , Make a comprehensive inspection of the equipment , After confirming the safety and reliability , Before lifting .( D )
A、500
B、800
C、400
D、200
38、【 Single topic selection 】《 Construction law 》 Regulations , Large construction projects or construction projects with complex structures , It can be jointly contracted by more than two contracting units . Performance of the contract by all parties to the joint contract ().( B )
A、 All alone bear their respective responsibilities
B、 Be jointly and severally liable
C、 Not liable
D、 Take appropriate responsibility
39、【 Single topic selection 】 Technical preparation includes ( ).( D )
A、 Control network 、 bench mark 、 Measurement of stakes , Five connections and one leveling , production 、 Preparation of temporary living facilities, etc
B、 Establish project organization , Assemble the construction team , Conduct entrance education for construction personnel, etc
C、 Preparation of building materials , Processing preparation of components and parts and products , Preparation of construction machines and tools , Preparation of production process equipment, etc
D、 Review of preliminary design scheme for project expansion , Be familiar with and review the construction drawings of the project , Natural conditions of the project construction site 、 Investigation and analysis of technical and economic conditions , Prepare project construction drawing budget and construction budget , Prepare project construction organization design, etc
40、【 Single topic selection 】 The lifting capacity of the eight chains generally does not exceed ( )t, Generally, the lifting height shall not exceed ( )m.( D )
A、15.6
B、10.7
C、15.7
D、10.6
41、【 Single topic selection 】 On the tower crane , Off the ground 2m The above platforms and walkways shall be provided with hand railings to prevent operators from falling . The height of hand railing shall not be lower than ().( B )
A、0.8m
B、1m
C、1.2m
D、1.5m
42、【 Single topic selection 】 Construction projects under supervision , from () Entrust the project supervision unit with corresponding qualification to supervise .( C )
A、 The general contractor
B、 Subcontractors
C、 Construction unit
D、 Construction administrative departments of people's governments at all levels
43、【 Single topic selection 】 When the saturated steam is heated into superheated steam in the superheater , The contained droplets will () Until it is steamed dry , Some substances in water droplets crystallize out .( A )
A、 evaporation
B、 concentrate
C、 Volatilize
D、 evaporation 、 concentrate
44、【 Single topic selection 】 The distance between the detector and the end wall is... Of the installation distance ( ).( A )
A、1/2
B、2/3
C、3/4
D、3/5
45、【 Single topic selection 】 Production and business operation entities shall truthfully record the investigation and treatment of potential accidents 、 Major hazard source management and other information , And in accordance with the law (), Under public scrutiny .( A )
A、 To the public
B、 Hang... In the office
C、 Announce to the construction personnel
D、 Report to the principal
46、【 Single topic selection 】 Comparison of construction schemes , The comparison of importance includes ( ).( C )
A、 Technical efficiency
B、 Degree of innovation
C、 Promotion and application value
D、 Investment amount
47、【 Single topic selection 】 The general design of construction organization is based on ( ) Construction organization design prepared for the main object , Yes. ( ).( A )
A、 Group project or super large project composed of several unit projects , The construction process of the whole project plays an important role in overall planning 、 The role of key control
B、 Unit project , The construction of unit works plays a guiding and restrictive role
C、 Divisional works or special works , Specifically guide the construction works
D、 Special projects , The construction of unit works plays a guiding and restrictive role
48、【 Single topic selection 】 Around the diesel generator ( )m Do not use stove fire blowtorch in the , Do not store inflammables .( C )
A、6
B、5
C、4
D、7
49、【 Single topic selection 】 An atom consists of a positively charged nucleus at the center and () Composed of , The atom itself is neutral .( C )
A、 An uncharged neutron outside the nucleus
B、 An uncharged neutron in a nucleus
C、 Negatively charged electrons outside the nucleus
D、 Negatively charged electrons in the nucleus
50、【 Single topic selection 】 When working at heights , Tools shall be readily available ().( C )
A、 Casually place
B、 Put it in a reliable place nearby
C、 Put it in the tool bag
D、 Tie it to your body
51、【 Single topic selection 】 Operator position ’ Security raw production Pass the mock exam at one point ’ The project manager who is not equipped with safety protection equipment shall record ().( B )
A、1
B、3
C、6
D、12
52、【 Single topic selection 】 The measuring point for measuring the circular section divides the section into several concentric rings with the same area according to the pipe diameter , Each ring is set with ( ) A measuring point .( B )
A、 3、 ... and
B、 Four
C、 5、 ... and
D、 6、 ... and
53、【 Single topic selection 】 The dimension of the weld length direction is marked in () The right side of the .( B )
A、 Auxiliary symbols
B、 Basic symbols
C、 Supplementary symbols
D、 Dimension symbols for welds
54、【 Single topic selection 】 The anchor rod can be designed as one layer or () layer ( C )
A、 On the second floor
B、 Three layers
C、 Multi-storey
D、 Only one floor can be designed
55、【 Single topic selection 】 The cause is ( ).( B )
A、 Refers to objects or substances that directly cause poisoning
B、 Objects and substances causing accidents
C、 It refers to objects or substances that directly cause injury and poisoning
D、 Objects and substances that cause injury
56、【 Single topic selection 】 The project department shall establish relevant management systems for the use of construction elevators, excluding ( ).( C )
A、 The post responsibility system of drivers
B、 Shift handover system
C、 Training on the use of lifts
D、 Maintenance and inspection system
57、【 Single topic selection 】 When the steel bar cutter cuts short materials , The distance between the hand and the cutter should be kept at () above , If the hand holding end is less than 400mm when , Sleeves or clamps shall be used .( A )
A、150mm
B、200mm
C、400mm
D、500mm
58、【 Single topic selection 】 Rhythmic artificial respiration , Non interruptible , Every minute should be () Time .· Safe production model quasi Test a little through ·( C )
A、8-12
B、10-14
C、12-16
D、14-18
59、【 Multiple choice 】 The leasing unit shall include in the lease contract of construction hoisting machinery signed , Clarify the safety responsibilities of both parties to the lease , And issue the following information ().( ABCDE )
A、 Manufacturing license for special equipment of construction hoisting machinery
B、 Product certificate
C、 Proof of record
D、 Self inspection certificate
E、 Installation and operation instructions
60、【 Multiple choice 】 The principles that the construction unit should master when formulating the project safety production responsibility system are ().( BDE )
A、 identity
B、 Legitimacy
C、 Comparability
D、 overall
E、 Operability
61、【 Single topic selection 】 Failure to regularly organize accident potential troubleshooting as required , Order to make corrections within a time limit ; Failing to correct within the time limit , Order to suspend production and business for rectification , Concurrently () fine .( C )
A、1 More than ten thousand yuan 2 Ten thousand yuan of the following
B、1 More than ten thousand yuan 5 Ten thousand yuan of the following
C、5 More than ten thousand yuan 10 Ten thousand yuan of the following
D、10 More than ten thousand yuan 30 Ten thousand yuan of the following
62、【 Multiple choice 】 The following statements about the installation of construction elevator , The right ones (). Safety student Production simulation Pass the exam at one o'clock ..( ACD )
A、 Before installation of construction elevator, all parts shall be inspected
B、 After the foundation of the construction elevator is fabricated, the installation operation can be carried out
C、 Before installation, safety technical disclosure shall be conducted for installation personnel , And sign on the disclosure for retention
D、 When there is something hanging from the boom , It is forbidden to start the construction elevator
E、 When the construction elevator is installed, the transfer tools or equipment can be thrown when the height is low
63、【 Multiple choice 】 The following items of construction in progress and temporary buildings () The place shall be equipped with fire extinguishers .( ABCD )
A、 Places where inflammable and explosive dangerous goods are stored and used
B、 Hot work site
C、 Storage of combustible materials 、 Processing and use place
D、 Various places with fire hazards
E、 At any place in the construction process
64、【 Multiple choice 】() All belong to limited space operation ( ABCDE )
A、 silo
B、 Containers
C、 The Conduit
D、 Inspection well
E、 Pit
65、【 Multiple choice 】 The design of formwork and its support shall be in accordance with () Conduct .( ABCD )
A、 Engineering structure form
B、 Load size
C、 Type of foundation soil
D、 Construction equipment and materials
E、 Construction plan
66、【 Single topic selection 】《 Guiding opinions of the State Council on strengthening and standardizing the supervision during and after the event 》 Strengthen the construction of standard system , Streamline and integrate mandatory standards , Focus on strengthening security 、 health 、 Energy saving 、 Standard construction in environmental protection and other fields , Optimize () The bottom line .( B )
A、 Recommended certification
B、 Mandatory standards
C、 Selective certification
D、 Classification certification
67、【 Multiple choice 】 The construction unit shall deal with the load-bearing members of the tall formwork support system entering the site 、 Of materials such as connectors () Review ( ABC )
A、 Product certificate
B、 Production license
C、 Test report
D、 appearance
E、 length
68、【 Single topic selection 】 Construction enterprises shall at least () Evaluate the implementation of safety production standardization of the unit for the first time , Verify the suitability of various safety production systems and measures 、 Adequacy and effectiveness .( A )
A、1
B、2
C、3
D、4
69、【 Multiple choice 】 Before excavating the earth in the landslide section, you should know ().( ABC )
A、 Geological survey data
B、 terrain 、 landscape
C、 Signs of landslide
D、 The surroundings
E、 Surrounding buildings
70、【 Judgment questions 】 The quality accident basically violates the provisions of the main control project of the construction quality acceptance specification , The general quality defects basically violate the provisions on appearance of general items in the code for acceptance of construction quality .( √ )
71、【 Judgment questions 】 The safety net of steel pipe fastener scaffold shall be fixed on the outside of the external upright , Enclose the net on the outside of each member .( × )
72、【 Judgment questions 】 It is allowed to ask questions at the bidding Q & a meeting , Explain the necessity of quantity review .( √ )
73、【 Judgment questions 】 The mortar mixer is running , Do not put hands or wooden sticks into the mixing drum or clean the mortar at the mouth of the drum .( √ )
74、【 Judgment questions 】 Large size air duct in basement 、 Safety production simulation test Try a little 、 Material selection of supports and hangers 、 The spacing of supports shall be designed separately , Apply the standard maximum size .( × )
75、【 Judgment questions 】 The acceptance of building intelligent engineering participating in the unit project shall be in accordance with 《 Unified standard for construction quality acceptance of intelligent building engineering 》GB50300-2013 The rules of .( × )
76、【 Judgment questions 】 The winch must have a good grounding or neutral connection device , The grounding resistance shall not be greater than 10Ω; On a power supply network , Grounding or neutral connection shall not be mixed .()( √ )
77、【 Judgment questions 】 Temporary suspension of construction on the construction site , The supervision unit shall do a good job in site protection .()( × )
78、【 Judgment questions 】 Road transport operators can carry out secondary maintenance on their own vehicles , Ensure that the vehicles put into operation meet the technical management requirements , Secondary maintenance completion quality inspection is required .( × )
79、【 Judgment questions 】 The number of professional and technical personnel engaged in transportation shall be commensurate with the scale of operation and management of the goods .( × )
80、【 Judgment questions 】 The factors affecting the progress of the installation project include the internal and external aspects of the construction project .( √ )
81、【 Judgment questions 】 The basic procedure of cost management is the six links or six aspects that must be achieved in macro cost control .( √ )
82、【 Judgment questions 】 Hanging cage ( Ladder cage ) It is the component of material elevator to carry people and materials , There is a transmission mechanism in the cage 、 Speed governor and electrical box, etc .( × )
83、【 Judgment questions 】 The purpose of cost assessment is to implement the principle of combining responsibility, power and interest , Reward or punish the responsible person according to the performance of cost control activities , Promote enterprise cost management 、 Cost control and healthy development .( √ )
84、【 Judgment questions 】 According to the conventional construction arrangement , The pump installation of the pump house is usually scheduled in the schedule “ Safety production simulation exam One o'clock through “ The end of the plan .( × )
85、【 Judgment questions 】 The camera shall be electrically tested before installation 、 debugging , Install after normal .( √ )
86、【 Judgment questions 】 Other vertical holes with falling risk to adjacent people and objects 、 The cave , All shall be provided with cover plate or protection , And there are measures to fix its position .()( √ )
87、【 Judgment questions 】 The greater the degree of resin crosslinking , The higher the mechanical strength , The larger the switching capacity .()( × )
88、【 Judgment questions 】 The amplitude and frequency of the roller during operation shall be controlled within the specified range .( √ )
89、【 Judgment questions 】 The glass bulb cutting object of the electrode collides with the beaker and other hard objects , The bulb is stained with dirt , It can be wiped with finger cotton , Or use 0.1mol/LHCL cleaning .( √ )
90、【 Judgment questions 】 Construction technical disclosure is a targeted project before the commencement of construction activities , About construction technology , What the technical management personnel do to the operator or the lower level technical management personnel to the higher level technical management personnel conforms to the laws and regulations 、 Important work meeting the requirements of technical management system .( × )
91、【 Judgment questions 】 Basic requirements for construction site management : Adopt the concept of risk management , Implement organizational 、 distinguish 、 All aspects of control and information feedback 、 Management of the whole process .( √ )
92、【 Judgment questions 】 Whether to conduct expert demonstration , The project department shall report to the technical director of the enterprise for approval , And obtain the approval of the general contractor .( √ )
93、【 Judgment questions 】 The legal representative of the enterprise is the first responsible person for safety production , The legal representative and project manager of the enterprise must pass the occupational safety and health management qualification certification , Work with certificate .()( × )
94、【 Judgment questions 】 Carry out welding and cutting in the hot work area , Welders must carry out hot work with hot work permit .()( √ )
95、【 Judgment questions 】 Mechanical use : The protective devices of construction machinery shall be complete 、 In good condition , Construction machinery with certificate operation requirements , The operator must work with certificate .( √ )
96、【 Judgment questions 】 The construction and installation sequence of panels and cabinets is mainly applicable to the installation of centralized high and low voltage distribution cabinets in the substation .( √ )
97、【 Judgment questions 】 There are two types of pressure test pumps, electric and manual , But the pump body belongs to plunger pump .( √ )
98、【 Judgment questions 】 The quality controller found that the hoop structure was unreasonable , The inspection method is monitoring method .( × )
99、【 Judgment questions 】 The project department organizes safety management 、 The construction of the 、 Risk management team with the participation of personnel from technical and other departments , And invite experienced operators to participate in the risk assessment and identification of each process activity .( √ )
100、【 Judgment questions 】 Hemp rope usually has three strands 、 Five shares and nine shares .( × )
Support accurate construction workers in all regions of the country - Device direction - Post skill examination questions , Support safety certificate , Special operation certificate , Exercises on the question bank of vocational skill appraisal and other types of work .
边栏推荐
- navicat定时任务无效
- Open classes are short videos! Tonight, I will teach you how to realize accurately!
- 【零基础微信小程序】基于百度大脑人像分割的证件照换底色小程序实战开发
- ROS察微【57】:配置手臂机器人来抓东西
- Oversampling series I: sampling theorem and oversampling rate
- 汉源高科USB3.0光端机USB工业触摸屏光端机USB3.0光纤延长器USB3.0光纤传输器
- HMS core video editing service has the ability to open templates, helping users get the same cool video with one click
- Signature analysis of app x-zse-96 in a Q & a community
- PPT制作3D旋转动画从入门到进阶
- MySQL在一个字段中匹配多个值
猜你喜欢

Analysis of six dimensional chart: analysis of enterprise growth of CSCEC

使用单调栈解题

Redis 入门-第一篇-数据结构与对象-简单动态字符串(SDS)

DevEco Device Tool 助力OpenHarmony设备开发

二维激光SLAM( 使用Laser Scan Matcher )

详解PyQt5信号与槽的关系

Introduction to redis - Chapter 1 - data structures and objects - simple dynamic string (SDS)

Shell process control - 39. Special process control statements

公开课丨玩的就是短视频!今晚教你精准变现!

How to uninstall and reinstall gazebo
随机推荐
Mobile securities account opening transaction? Is it safe to open an account online now?
ROS knowledge: the calling practice of librviz Library
halcon原理:相关性匹配
Getting started with redis - Chapter 2 - data structures and objects - linked lists
Introduction to redis - Chapter 3 - data structures and objects - Dictionary
Halcon knowledge: dyn_ Usage of threshold (scratch detection)
Getting started with redis - Chapter 4 - data structures and objects - jump table
Redis 入门-第二篇-数据结构与对象-链表
2D laser Slam (using laser scan matcher)
请问连接oracle时,这个version 1.54 是什么的version?
2022工具钳工(初级)考试练习题模拟考试平台操作
ROS知识:点云文件.pcd格式
"Dream of children's travel" in 2022, GAC Honda children's road safety charity travel entered the Northeast
在工作中学习的三个方法
ROS2知识(6):坐标对象TF原理和实践
“梦想童行” 2022年广汽本田儿童道路安全公益行走进东北
Go 语言使用 MySQL 的常见故障分析和应对方法
DuPont analysis: what is the investment value of Anyang Iron and Steel Co., Ltd?
halcon原理:一维函数function_1d类型【1】
QT5知识:QT绘制图形