Some experiences of project K several operations in the global template

2022-06-24 15:56:00 Golden brother who can play SAP

K Some experience of the project, several operations in the global template

1, Data migration phase , In the material master data classification view ,batch class The code is the same as the material number .

This means that if the materials to be migrated are 1 m , The importer will automatically create 1 ten thousand 023 Classification of types , Then assign the corresponding characteristics to these classifications .

In most projects with classification enabled , For material master data , Several factors will be considered according to the type of material , Create a few 023 Type of class. these class The number of , Will be strictly controlled in 10 within , More or dozens . Then many materials of the same type or the same product family , Assign the same 023 Classification of types . This is a SAP Implement... In the project best practice.

K Project approach , I don't see any benefit .

2, Data migration phase , Inspection plan master data , Each material creates its own independent inspection plan group .

This means that if the item number to be migrated has 1 m , The data migration phase will create 1 m inspection plan group. If in business practice , The inspection characteristics of each material are different , And these inspection items need to be in SAP Enter the results in the system and evaluate , Then there's nothing wrong with doing this . The problem is K The inspection characteristics of these inspection plan groups in the project are basically the same , The specific quantitative test indicators are not in SAP System management .

I really can't think of the benefits of such a design . However, the author estimates that it is because of the data import LSMW Tools , Creating inspection plan Master data , Due to technical difficulties and other reasons , Make the customer headquarters data team Take this simplified way to solve . This way looks silly , But it can be guaranteed that there will be no mistakes .

3,MES The system is extremely rigid , Functional comparison low.

For example, some common special characters in the material description cannot be displayed normally . For another example, the basic UOM of a material must follow BOM The units used in the are the same , In case of inconsistency MES The system will not work .

- End -

Written in 2021-4-22